It's open now & we're always open. Call 24/7: (360) 555-0142

New Builds

New Construction Landscaping & New Home Yard Installation in Woodland, WA

From bare, compacted fill to a finished yard: soil rebuilt, roof water given somewhere to go, irrigation in, then sod, shrubs and fresh bark dust.

  • Compacted fill loosened and amended
  • Roof water routed away from house
  • Irrigation in before sod and beds
  • Open 24/7, free on-site estimates

Call for a Free New Home Landscaping Estimate

Describe the job on the phone and we will book a time to walk your property.

(360) 555-0142
  • A real person answers, 24 hours a day
  • Free on-site estimate, booked on the call
  • Ask us about new construction landscaping
Tap to Call Now

Open 24 hours a day, 7 days a week

If you need new construction landscaping in Woodland, WA, you are probably looking at compacted fill, downspouts dumping onto bare dirt and maybe a strip of builder sod out front. That ground was graded for a foundation, not a lawn, and the first year decides whether the yard drains or turns to mud and moss.

Bogar Landscaping turns new-build lots into finished yards across Clark and Cowlitz County, from subdivisions in Ridgefield, Battle Ground and La Center to rural homes on septic and wells. We rebuild the soil, handle the roof water, install irrigation, and finish with sod, planting beds and bark dust.

What Our New Construction Landscaping Includes

Every new-build yard is quoted after a site visit, but a full install usually covers:

  • Debris cleanup. Leftover concrete, wood scraps and rock picked out before grading.
  • Grading. Final shaping so water moves away from the foundation. See yard grading and erosion control.
  • Soil rebuild. Compacted subsoil loosened, then topsoil or compost brought in.
  • Roof water. Downspout lines, dry creek beds or catch basins. Our downspout drainage page covers the options.
  • Irrigation. Sprinkler zones for lawn and drip for beds, in before anything is planted.
  • Lawn. Sod installation on the prepped soil.
  • Beds and hardscape. Shrubs, trees, steel edging and bark dust, plus patios or gravel side yards if you want them.
New construction yard finished with sod, fresh bark and new shrubs

New Home Yard Installation: From Bare Dirt to Finished Yard

The new-build yard in our photos shows the usual sequence. The lot started as bare, graded dirt. We shaped it, laid sod, planted shrubs into beds finished with fresh bark dust, and built a river rock dry creek to carry roof water away from the house instead of letting it pool at the foundation.

That last piece matters more than most new owners expect. A roof sheds a lot of water in a Southwest Washington winter, and compacted fill gives it nowhere to soak in, so it needs a defined path. Our rain garden page explains when a rain garden can take that water.

Signs Your New Yard Needs More Than the Builder Left

  • Water stands on the lawn or along the foundation after rain.
  • Builder sod is yellowing or thin, usually because it sits on compacted fill with little topsoil.
  • Downspouts empty onto bare ground right next to the house.
  • The backyard is still dirt, and mud is tracking indoors all winter.
  • Your HOA has a landscaping deadline coming up.
  • Rain is cutting channels across a sloped lot.
River rock dry creek bed carrying roof runoff away from a new homeBackyard regraded with fresh topsoil and ready for sod after moss and thatch removal

How We Install a New Home Yard, Step by Step

  1. Site walk. Grades, downspouts, soil, utility boxes, and septic or well locations.
  2. Utility locate. Washington's dig law requires one before excavation, and new lots are full of fresh utility lines.
  3. Clean up and rough grade. Debris out, ground shaped to drain.
  4. Loosen and amend. Compacted subsoil is broken up and topsoil or compost added.
  5. Drainage and irrigation. Downspout lines, dry creeks, sprinkler mains and drip go in while the ground is open.
  6. Fine grade and roll.
  7. Plant beds. Shrubs and trees, steel edging and bark dust.
  8. Lay sod and water it in.
  9. Walk-through. We show you the controller and leave a first-year watering plan.

Common Choices for New-Build Yards

Decision Option Best when Trade-off
Lawn Sod You want the mud gone now, or the lot slopes Higher cost up front
Lawn Hydroseed or seed Large rural areas Weeks of watering, mud meanwhile
Bed cover Bark dust Most shrub beds Needs topping up
Bed cover River rock Downspout areas, narrow strips Hard to replant
Roof water Dry creek A visible path to a safe outlet Uses yard space
Roof water Buried drain line Small lots, water crossing the lawn Needs a place to discharge
Smooth river rock bed with steel edging along a newly built home

New Construction Landscaping in Woodland, WA and Nearby Subdivisions

Woodland grew from 5,509 residents in 2010 to 6,531 in 2020, and new subdivisions keep going in here and in Ridgefield, Battle Ground and La Center. The yards share the same problems: topsoil stripped during site work, heavy equipment compacting what is left, and a thin layer under builder sod.

Washington's stormwater manual sets a post-construction soil standard for development sites: 8 inches of topsoil with 10% organic matter in planting beds and 5% in turf, with the subsoil below loosened at least 4 inches. That is the benchmark we compare your lot to when we dig a test hole.

Subdivision lots also mean tight access and HOA rules. Read your CC&Rs for required street trees, front lawn or a completion deadline, and we can provide a plan and plant list for architectural review.

Rural New Builds: Septic, Wells and Acreage

New homes on acreage off SR-503 or up the Lewis River valley bring a different set of limits:

  • Septic drainfields. Washington's Department of Health says grass is the best cover over a drainfield, trees and shrubs belong away from the tank and drainfield, and vehicles and heavy equipment stay off it. We mark the drainfield and reserve area before equipment moves.
  • Roof water. DOH also says to divert roof and driveway runoff away from the drainfield, so downspout lines and dry creeks are routed around it.
  • Wells. The Rain Garden Handbook keeps rain gardens 100 feet from drinking-water wells.
  • Well-fed irrigation. Zones are sized to what your pump and pressure tank can deliver.

What Affects the Cost of New Construction Landscaping in Woodland

  • Lot size and how much becomes lawn, beds or hardscape.
  • Soil condition. Heavily compacted fill needs more loosening and more imported soil.
  • Grading. Lots that pitch toward the house need more earthwork.
  • Drainage. Number of downspouts and distance to a safe outlet.
  • Irrigation. Zone count, drip for beds, and city water or well.
  • Plants. Count and size.
  • Access. Fenced backyards with narrow gates slow everything down.

Your written estimate breaks out soil, drainage, irrigation, lawn and beds.

Why Choose Us

Why New Homeowners in Woodland Call Us for Their First Yard

24/7
Phone answered

Reach Us During the Move-In Chaos

Closing, moving and unpacking leave little time for phone tag. Our phone is answered 24 hours a day, 7 days a week, so you can call when you finally have a minute and book a free on-site estimate. At the visit we walk the lot with you, find where the roof water is going and check how compacted the ground is before we price anything.

8 in.
Topsoil benchmark

Soil Fixed Before Anything Is Planted

Ecology's post-construction soil standard calls for 8 inches of topsoil with 10% organic matter in beds and 5% in turf, over subsoil loosened at least 4 inches. When a lot falls short of that, builder sod yellows and moss moves in. We loosen compacted fill, bring in soil and compost where the ground needs it, and only then lay sod and plant.

1 Crew
Grade to final bark

One Crew for the Whole Lot

A new-build yard needs grading, drainage, irrigation, sod, planting and bark dust, usually in that order. Our crew does all of it, as the new-build yard in our photos shows: sod, fresh bark beds, shrubs and a river rock dry creek carrying roof water. You are not scheduling a grader, an irrigation company and a landscaper around each other.

Our Work, Before & After

New Construction Landscaping Projects, Before and After

Our own photos from real jobs, including a new-build yard with sod, fresh bark, shrubs and a river rock dry creek. No stock images.

Crew planting new shrubs into a freshly prepared garden bed
During
New construction yard finished with sod, fresh bark and new shrubs
After

New Construction Yard: Planting, Bark and Sod

On this new build we prepared the beds, planted shrubs along the house and drive, spread fresh bark and finished the open ground in sod.

Smooth river rock bed with steel edging along a newly built home
Rock bed
River rock dry creek bed carrying roof runoff away from a new home
Dry creek

River Rock Beds and a Dry Creek for Roof Water

Around a newly built home we set steel edging, laid river rock along the foundation and ran a river rock dry creek to carry downspout water away from the house.

FAQ

New Construction Landscaping FAQs for Woodland and Southwest Washington

How soon after closing should I landscape a new home?

As soon as you reasonably can. Bare fill erodes, turns to mud in the rainy season and gets colonized by weeds. Grading and drainage go best in the drier months, and fall is the best time to plant. If you close in winter, we can plan now and build when the ground is workable.

Can you landscape over my septic drainfield?

Lightly. Washington's Department of Health recommends grass as the best cover and keeping trees, shrubs, vehicles and heavy equipment off the drainfield. We keep equipment off it, route roof water around it and keep rain gardens well away from the whole system.

The builder left my downspouts dumping on the ground. What should I do?

Give the water a defined path away from the house: a buried line to a safe outlet, a river rock dry creek, or a rain garden where the soil drains. Which one fits depends on your grade and soil. Our downspout drainage page compares the options.

Should sprinklers go in before the sod?

Yes. Trenching mains and setting heads is far easier on bare, graded soil than through a finished lawn, and it lets the new sod get water from day one. We install irrigation after rough grading and before fine grading, planting and sod.

On the Map

New Construction Landscaping in Woodland, WA: Our Home Base

Our crew is based in Woodland, on the Clark and Cowlitz County line, and works from here up and down I-5 and SR-503.

Call (360) 555-0142

Related Services

More Services From Your Woodland, WA Landscaper

Most yards need more than one fix. These services pair naturally with new construction landscaping. You can also read how our crew works or go back to the Bogar Landscaping home page.

Curved paver patio beside raised cedar garden beds and weeping evergreens

Landscape Design & Installation

Yard plans built around drainage, shade and soil, then installed by one crew: grading, patios, walls, beds, lawn and irrigation.

Ready to Turn the Dirt Lot Into a Yard?

Call any hour. We will walk your new lot and give you a written estimate for soil, drainage, irrigation, lawn and beds.

Call (360) 555-0142 Open 24/7. Free on-site estimates.

Sources

  1. Census figures via Wikipedia (en.wikipedia.org)
  2. Ecology BMP T5.13 (soilsforsalmon.org)
  3. DOH (doh.wa.gov)
  4. Rain Garden Handbook (apps.ecology.wa.gov)